Port Hedland, WA - Wind Region D

5th June, 2024 - GenOffGrid Installation

Wanangkura Stadium

Wanangkura Stadium

GenOffGrid has chosen Sunlock for several installations in the Town of Port Hedland in Western Australia, including Wanangkura Stadium, South Hedland skate park and the depot.

The significance of this installation lies in its location within Wind Region D, an area characterized by the highest wind speeds and potentially cyclonic conditions. Sunlock stands out as the leading commercial mounting system on the market, designed to withstand these extreme conditions. In such regions, meticulous design and engineering are essential to ensure the safety, durability, and performance of solar installations.

Sunlock is committed to delivering reliable and sustainable mounting solutions even in the toughest environments.

Previous
Previous

ANSTO’s Australian Synchrotron

Next
Next

Metcash’s New Distribution Centre